This Pacific Power Source application note explains burn-in testing in R&D and production, and compares resistive loads with regenerative electronic loads. It is for engineers planning burn-in of power products such as energy storage systems, EV power electronics, power supplies and solar inverters.

Inside the note:

  • How R&D and production burn-in differ, and where accelerated life testing fits
  • Burn-in for energy storage systems, EV chargers and power electronics, UPS and data centre server power supplies, and solar inverters
  • A comparison of resistive and regenerative loads on energy use, cooling, cost, scalability and automation
  • A simplified worked example in which Pacific Power Source estimates a 10 kW, 10-hour test uses 11 kWh with a regenerative load, against 200 kWh with a resistive load and its cooling
  • Ten points to consider when choosing a regenerative load for burn-in